Amazon disclosed for the first time that its global data-center operations withdrew about 2.5 billion gallons of water (roughly 9.46 billion liters) over the full year 2025, reporting a water usage effectiveness (WUE) of 0.12 L/kWh, with server cooling as the primary use. In a company blog post, Amazon said withdrawals at its owned and operated sites fell 2% versus 2024 despite an increase in the number of buildings (details).
Continue reading
The rest of this article is for AI News Blitz readers. Choose an option below to keep reading.
Already purchased? Sign in✓ Signed in — this article isn’t included in your current plan.